RECONSTRUCTION OF THE GRAIN RECEIVING, CLEANING AND DRYING COMPLEX

Khmelnytskyi region, Krasyliv district, Kremenchuky village

Station of receiving, cleaning, drying and grain shipments into the road transport was built on the existing complex with floor grain storing warehouses. Station was connected with existing warehouses by conveyor galleries. Solutions designed by Delta-Engineering experts made it possible to increase the volume of grain receiving and drying up to 2,000 tones/day, and the volume of shipments - up to 500 tons /day. The project envisages the arrangement of the intake pit, construction of the grain-dryer, assembling of metal structures of conveyor galleries, building of the 250 tons Symaga production operational silo, installation of energy efficient PERRY M-617 grain dryer and grain cleaning equipment.