BUILDING OF THE PUMPKIN SEED PROCESSING LINE AND SOYBEAN, BEANS PROCESSING LINES OF THE SEED FACTORY

Khmelnytskyi region, Shepetivka district, Lotivka village

The project is implemented in two stages. In 2015, the first stage of construction was commissioned - pumpkin seeds processing line with capacity of 48 tons/day. This line enables to receive, wash, dry and prepack pumpkin seeds according to European standards. In the process of project implementation a set of measures on energy saving has been used. In particular, for drying pumpkin seeds solid fuel heat generators that run on biofuel (sawdust, wood or straw pellets) have been designed and installed. The second phase of construction envisages arrangement of the beans processing line, which will include receiving, cleaning, drying, storing and sorting, preseeding purification, packaging, and shipping stations. The peculiarity of this line is the application of "gentle" transport and drying equipment, as well as modern sorting equipment (SATAKE color sorter).

Back to Top