Storage capacity
6000 t
Construction scope
117 981,6 m3
Construction area
10 557,13 m2
Plot area
9831,80 ha
Storage capacity
6500 t
Construction scope
66 254,4 m3
Plot area
5521,2 ha
Construction area
5935,52 m2
Fruit Storage No.2 — the second stage
Fruit Storage No.1 — the first stage

Fruit Storages 6500 and 6000 t

The project provides for the construction of a fruit storage in 2 stages (two separate buildings).

The first stage is a fruit storage with a capacity of 6.6 thousand tons. The second stage is a fruit storage for 6 thousand tons with a sorting line.

2018
Chernivtsi region, Strumok
By regulating the temperature, humidity, oxygen and carbon dioxide content in sealed chambers, the best conditions for storing different types and varieties of fruit are achieved.

This technology allows to store fruit fresh for a long time with minimal loss of consumer properties.
Technical parameters
Fruit Storages
Other projects
Pumpkin Line
The project was implemented in two stages. In 2015, the first stage of construction was put into operation ...
Khmelnytsk region, Lotivka
Seed Plant
The plant is designed according to the highest international processing standards (high quality cleaning ...
Khmelnytsk region, Lotivka
Elevator Facility
The project is completed, a modern elevator facility for 40 thousand tons was put into operation. The facility...
Chernivtsi region, Shyshkivtsi
Any questions?
Leave your contacts, we will call you back and tell you everything that interests you
© 2021 LLC Delta Engineering
Design & Developing —
About company
Learn about the history of Delta Engineering — we provided detailed information about the Company and results of work