Pumpkin Line
The project was implemented in two stages. In 2015, the first stage of construction was put into operation — pumpkin seed processing line with a capacity of 48 tons per day. This line allows receiving, wash, dry and pack pumpkin seeds according to European standards.
During the project implementation, a set of energy saving measures was involved. In particular, solid fuel heat generators running on biofuels (sawdust, wood or straw pellets) were designed and installed for drying pumpkin seeds.
Khmelnytsk region, Lotivka
The second stage of construction provides for the installation of a bean processing line, which will include areas for receiving, cleaning, drying, storage, sorting, pre-sowing cleaning, packing and shipment. A feature of this line is the use of "gentle" transport and drying equipment, as well as modern sorting equipment (SATAKE photo separator).