Khmelnytsk region, Lotivka
The project was implemented in two stages. In 2015, the first stage of construction was put into operation ...
The plant is designed according to the highest international processing standards (high quality cleaning ...
Khmelnytsk region, Lotivka
The project is completed, a modern elevator facility for 40 thousand tons was put into operation. The facility...
Chernivtsi region, Shyshkivtsi
Grain Reception and Drying Facility
The project was provided for the construction of facilities for receiving grain with a capacity of 70 m3, two ...
Facility for Agricultural Products Processing
The project was implemented in one stage. The constructed buidings are located to provide operation ...
Khmelnytsk region, Kuzmyn
The project implemented a regulated gas environment. In the designed fruit storage...
Chernivtsi region, Kobolchyn
The project provides for the design of a fruit storage with a stable temperature mode. During...
Chernivtsi region, Romankivtsi
Fruit Storages for 6500 t and 6000 t
The project provides for the construction of a fruit storage in 2 stages (two separate buildings). The first stage...
Chernivtsi region, Strumok
According to European standards, there is an automated process for eggs collection, feeding and watering of ...
Zhytomyr region, Ostrozhok
The project provides for the reconstruction of a complex for drying, cleaning and storage of agricultural...
Cherkasy region, Polovynchik
The project provides for the construction of a complex of buildings and facilities for the production of fodder and premixes...
Complex of buildings and structures for the production of fodder and premixes
The project provides for the technical reequipment of the grain receiving and drying unit...
Zhytomyr region, Novohrad-Volynsky
The project designed the "Mirt" furniture factory, which is one of the largest production facilities in Ukraine...
The project provides for the technical retrofit of the distillery...
Raw material preparation area "Nemyrivsky distillery"