Plot area
3,7353 ha
4201 m2
Construction area
4320,60 m2
Total area
5388,50 m3
Construction scope
5000 t
Storage capacity

Fruit Storage 5000 t

The project provides for the design of a fruit storage with a stable temperature mode.

During the project implementation the gas environment was designed with the possibility of its regulation.

2020
Chernivtsi region, Romankivtsi
As a result of the design works, an environment was created in which the shelf life of the fruit was increased to nine months, without additional use of chemicals.
Fruit Storages
Technical parameters
Other projects
Pumpkin Line
The project was implemented in two stages. In 2015, the first stage of construction was put into operation ...
Khmelnytsk region, Lotivka
Seed Plant
The plant is designed according to the highest international processing standards (high quality cleaning ...
Khmelnytsk region, Lotivka
Elevator Facility
The project is completed, a modern elevator facility for 40 thousand tons was put into operation. The facility...
Chernivtsi region, Shyshkivtsi
Any questions?
Leave your contacts, we will call you back and tell you everything that interests you
© 2021 LLC Delta Engineering
Design & Developing —
About company
Learn about the history of Delta Engineering — we provided detailed information about the Company and results of work