Grain Reception and Drying Facility
The project was provided for the construction of facilities for receiving grain with a capacity of 70 m3, two noria towers and two silos with a conical bottom. An improvement plan with passages was developed, taking into account the turning radii of freight transport.

During the project implementation a set of energy saving measures and protection against lightning was involved.
Khmelnytsk region, Rudka
The technological scheme of the facility was adapted in accordance with the solution of the customer. The facility productivity for receiving and drying grain is 17 tons per hour.
Grain crops
2019
Technical parameters
304,5 m2
Construction area
1077,04 m2
Total area
9246 m3
Construction scope
17 tons per hour
Production capacity
Other projects
Khmelnytsk region, Lotivka
The project was implemented in two stages. In 2015, the first stage of construction was put into operation ...
Pumpkin Line
Khmelnytsk region, Lotivka
The plant is designed according to the highest international processing standards (high quality cleaning ...
Seed Plant
Chernivtsi region, Shyshkivtsi
The project is completed, a modern elevator facility for 40 thousand tons was put into operation. The facility...
Elevator Facility
Learn about the history of Delta Engineering — we provided detailed information about the Company and results of work
About company
Design & Developing —
© 2021 LLC Delta Engineering
Leave your contacts, we will call you back and tell you everything that interests you
Any questions?